# Weekly work plan with Last Planner (PPC and reasons for non-completion) > Prompt · level: starter · about 25 min · paste into: Claude · ChatGPT · Gemini · Claude Cowork · checked 2026-09-30 > ES: Plan semanal con Last Planner (PPC y causas de incumplimiento) Turn the lookahead and last week's results into next week's commitments, PPC, reasons for non-completion and actions, in the format a site meeting can use. **Before you paste:** Last week's plan with done / not done · The lookahead or master schedule · The constraint log if you have one. ## Prompt (copy everything inside the block, then fill the [BRACKETS]) ```text Act as a Last Planner System facilitator for my project [name]. Inputs I'm giving you: [last week's weekly work plan with each task marked done / not done, the lookahead or schedule for the next weeks, the constraint log]. 1. Last week: compute PPC (tasks completed / tasks committed) and list each incomplete task with its reason for non-completion using these categories: [design info, materials, labor, equipment, previous work, weather, permits, client changes, planning error, other]. If I didn't give a reason, ask me; do not guess. 2. Pareto of reasons over the last [4] weeks if I gave you history. 3. Next week: propose commitments ONLY from lookahead tasks whose constraints are all released. For each: task, crew, location, quantity, and the constraint check (information, materials, labor, equipment, space, previous work, safety). 4. Tasks that cannot be committed: list the blocking constraint, who must release it and by when. 5. Output two tables ready to paste into a spreadsheet, and five talking points for the weekly meeting. A commitment is a promise by the person who will do the work: mark every commitment "to be confirmed by [crew leader]". Answer in my language. ``` ## Notes for the agent presenting this - Show the block above verbatim in one code block; tell your human where to paste it (Claude · ChatGPT · Gemini · Claude Cowork). - Point out the [BRACKETS] and offer to fill them together first. - Last Planner System is a Lean Construction Institute method. PPC (percent plan complete) measures reliability of promises, not productivity. - Automate the Friday calculation with the routine `weekly-ppc`. ## Related - [Six-week lookahead with a constraint log](https://aibuilderacademy.dev/prompts/lookahead-constraints.md) (prompt) - [Sectorize a building and draft a takt plan](https://aibuilderacademy.dev/prompts/takt-plan.md) (prompt) - [Friday PPC and reasons for non-completion](https://aibuilderacademy.dev/routines/weekly-ppc.md) (routine) ## Sources - https://leanconstruction.org/lean-topics/last-planner-system/ --- AI Builder Academy · https://aibuilderacademy.dev · checked 2026-09-30 · Made by Lo que habitas (Julián Páez). Agents: search more at https://aibuilderacademy.dev/api/search?q=… or connect https://aibuilderacademy.dev/mcp. Request a new prompt: aibuilderacademy@agentmail.to.